Bien Dong Moc Tinh Topside project
Bien Dong 1 Project included items: Hai Thach, Moc Tinh jackets and Topsides with total around 70km of pipe, 20km of cable
Ca Mau Fertilizer Plant
Ca Mau fertilizer Plant is final project of combination Gas-Electricity-Fertilize projects
Dung Quat Refinery
Dung Quat Refinery project is one of severals importance economic projects of Vietnam
• Owner: Petrol Vietnam
• Investment: USD 2,7 Billion
• Capacity: 6,5 million per year
Ca mau 1 & 2 Power Plants
Location: Ca Mau Province
Contractor: Siemens
TTAsia carried out RT, MT, UT, PT, HT, PMI ….. for items achive high quality and safety with appreciated by Contractor.
Phu My-My Xuan-Go Dau Gas Distribution Pipeline – Phase 2
Location: Phu My-My Xuan-Go Dau
Owner: Petrol VietNam
T.T.Asia carried out RT for Gas Pipeline Phase 2 under the Complex Gas at Phu My-My Xuan-Go Dau industrial zone for clients.
Vietsovpetro platform no.3 and no.6
T.T.Asia carried out MT,UT during platform repair and maintenance.
Cambodia Bridge
Place: Cambodia
This is one of the iron Bridge with the largest area of South East Asia constructed by the Poslilama Company and TTAsia carried out Non Destructive Testing for weld complied with AWS standard.
Phu My 3 Power Plant
Location: Phu My – BRVT Province
TTAsia and SGS periodic corrosion inspection of equipments, piping, pressure vessels.
 [1]   [2]   [3]   