Category: Conventional NDT Project
-
UTM Teams from July 2nd to July 5th 2022
Over 17.000 thickness measurement points inside the boiler were carried out by this team within 4 days of working.
-
Eddy Current Testing, UTM and other Non-destructive Testings for Power Plant in July 2022
In July 2022, TTA Company has carried out Eddy Current Testing for over 20.000 tubes; Thickness measurement for Boiler and piping for approximate 3.000 points; and other NDT method such as: Ultrasonic Testing, Dye Penetrant Testing, Magnetic Particle Testing, Radiographic Testing. We also collected samples by using the “replica” method for microstructure analysis.
-
UTM at Long Son Refinery and Petrochemical Plant 2022
In 2022, TTA Company is working in Long Son Refinery and Petrochemical Plant as a contractor who provide Ultrasonic Thickness Measurement with approximate 90.000 Thickness Measurement Locations for both piping and equipment.